Scroll down

For those investors within Octopus EIS 14 the performance of Chillingham Power Limited has remained in line with recent expectations. Angus Power Limited saw a small uplift in value which was the result of lower than expected operating costs. Unfortunately the performance of Brangus Power Limited resulted in the portfolio dropping more than 10% over the period. This was due to a fault with the mixers and feeder at the site which meant that repair and maintenance costs during the period were higher than expected. This was compounded by the lost revenue while the fault was fixed and the site was not operational.

We understand that the performance of the Octopus EIS 14 hasn’t met expectations. If it would help to speak with one of the portfolio managers, please don’t hesitate to call us on 0800 316 2295 or email us at clientrelations@octopusinvestments.com and we’ll be happy to help you in any way we can.

Regards,
The Octopus Team

Issued by Octopus Investments Limited, which is authorised andregulated by the Financial Conduct Authority. Registered office: 33 Holborn, London, EC1N 2HT. Registered in England and Wales No. 03942880. We record our telephone calls. Issued April 2018 M2-CAM06815-1804.